Undertake the construction project is a complex process and the needed The project requires many different set of resources. Risk can Minimization and return to become familiar with the design and construction to maximize Process, making informed decisions along the way.

 

  • A new building, or a building to add front of the building Renovation projects can be designed, the design requirements must first be established and recording. Document contains detailed requirements for the design called The construction plans. It is composed of, or created through consultation with the owners. usually, Building program was created by an architect or other trained professional designers There are design and construction process for a comprehensive understanding. That Construction will include information such as design standards, and space area Requirements, spatial relations, equipment, site work, budget and schedule Claim.

 

  • Survey & Analysis of Existing Conditions If it is a construction site Select or reservations, on-site investigation, survey or existing facilities are required. The new building, a ALTA surveys, topographic surveys, or will need, and can be provided by a licensed surveyor. For building additions and remodeling survey of existing facilities may be performed by anyone, but should be provided by the same person for the project design services performed. For adding new buildings and buildings, a soil survey report, as may be required by geotechnical engineers. If a construction site has not been Select a site analysis and site selection services are available from the Real Estate Training Or design professionals. Market research may be required to determine the social, Economic and political needs, and how the project will be received by Expected users and others. An economic feasibility study to determine possible Estimated project cost, financing needs, interests and ROI Claim.

 

  •  Site Development Planning and Site Utilization Studies can be a critical element in the overall design of a facility. On phased projects, for example, a master plan may be required in order to optimize the utilization of the site. Infrastructure, open space, parking and areas for future building pads must be planned and reserved for phase four before construction on phase one can begin. On-site and off-site utility studies may be required to determine the feasibility of the proposed project, with respect to the required vs. the available utilities. Applications may be required to meet zoning regulations in the jurisdiction where the project will be constructed. These applications usually require a substantial amount of work well in advance of the detailed design of the project. For some projects, a public hearing is required, and will be scheduled a month or more after the date of the application.

 

  • Design: In the single-family residential projects, a single designer or architect may To complete the entire design and construction drawings of their abilities. On Larger projects, however, may require a wide array of design professionals offer Design and construction projects. architecture design & Documents, structural engineering, mechanical engineering, electrical engineering, Civil engineering, landscape architecture, interior design, system design and special Materials research and standardization is needed between the various disciplines Commercial, residential institutional and industrial Construction  project. In most instances, Authorities have jurisdiction over the project will need to obtain professional licenses, designed for these disciplines.

 

Source : articlesbase.com

0 comments:

Post a Comment

 
Rewrite Article © 2016.Someright Reserved.
Top